                     DEPARTMENT OF LABOR AND ECONOMIC GROWTH

                          PUBLIC SERVICE COMMISSION

                    TECHNICAL STANDARDS FOR ELECTRIC SERVICE


(By authority conferred on the public service commission by section 7 of 1909 
PA 106, section 5 of 1919 PA 419, and sections 4 and 6 of  1939  PA  3,   MCL 
460.557, 460.55, 460.4, and 460.6.)


                        PART 1. GENERAL PROVISIONS


R 460.3101   Applicability; purpose; modification; adoption  of  rules    and 
regulations by utility.
  Rule 101. (1) These rules  apply  to  electric   utilities   that   operate 
within the state of Michigan under the jurisdiction of  the  public   service 
commission.
  (2) These rules are intended to promote safe and adequate  service  to  the 
public and to provide standards for uniform and   reasonable   practices   by 
utilities.
  (3) These rules do not relieve a utility from any of   its   duties   under 
the laws of this state.
  (4) Each utility may adopt reasonable rules   and   regulations   governing 
its relations with customers which it finds necessary and   which   are   not 
inconsistent with these rules for  electric  service.   Adopted   rules   and 
regulations shall be filed with, and approved by, the commission.

  History:  1983 AACS; 1996 AACS.


R 460.3102   Definitions.
  Rule 102. As used in these rules:
  (a) "Acceptable to the commission" means that a commission order has   been 
obtained.
  (b) "Approved by the commission" means that a commission  order  has   been 
obtained.
  (c) "Commission" means the Michigan public service commission.
  (d) "Customer," except as used in R  460.3411,  means  any  person,   firm, 
association, or corporation, or any agency of the federal, state, county,  or 
municipal government that purchases electric service supplied by a utility.
  (e) "Electric plant" means all real estate, fixtures, or property that   is 
owned, controlled, operated, or managed in connection with, or to  facilitate 
the production, transmission, and delivery of, electric energy.
  (f) "File" means to deliver to the commission's executive secretary.
  (g) "Meter," unless otherwise qualified, means a device that measures   and 
registers the integral of an electrical quantity with respect to time.
  (h) "Metering error" means a failure to accurately measure and record   all 
of the electrical quantities that are required  by  the  applicable  rate  or 
rates.
  (i) "Meter shop" means a shop where meters are  inspected,  repaired,   and 
tested. A meter shop may be at a fixed location or may be mobile.
  (j) "Premises" means an undivided piece of land that is not  separated   by 
public roads, streets, or alleys.
  (k)  "Submit"  means   to   deliver   to   the   commission's    designated 
representative.
  (l) "Utility" means an electric company, whether  private,  corporate,   or 
cooperative, that operates under the jurisdiction of the commission.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



R 460.3103   Rescission.
  Rule 103. R 460.501 to R 460.505 of the   Michigan   Administrative   Code, 
appearing on pages 4695 to 4709 of the 1979  Michigan  Administrative   Code, 
are rescinded.

  History:  1983 AACS.


                        PART 2. RECORDS AND REPORTS

R  460.3201   Records; location; examination.
  Rule  201.  Upon  a  request  by  the  commission   or    its    designated 
representative, records which are required by these  rules   or   which   are 
necessary for the administration of these rules shall  be  available   within 
the state of Michigan for examination by the commission  or  its   designated 
representative.

  History:  1983 AACS; 1996 AACS.


R  460.3202   Records; preservation.
  Rule 202. Unless otherwise specified in these rules, or by  other  order of 
the commission, all records that are  required  by  these  rules   shall   be 
preserved for the period of time specified in R 460.2501  et   seq.  of   the 
Michigan Administrative Code.

  History:  1983 AACS.


R  460.3203   Documents and information; required submission.
  Rule 203. A utility shall submit all  of  the   following   documents   and 
information and shall maintain the documents and information  in  a   current 
status:
  (a) A copy of the utility's tariff.
  (b) A copy of the utility's rules and standards that are made  available to 
the public covering meter and service installation.
  (c) A copy of each type of customer bill form.
  (d) A list of the cities,  villages,  and  townships   that   the   utility 
serves. Upon a request by the commission or  its  designated  representative, 
the  utility  shall  also  provide  copies  of   the   associated   franchise 
information.
  (e) The name, title, address, and telephone number of the  persons  to   be 
contacted in connection with the following matters:
  (i) General management duties.
  (ii) Customer relations (complaints).
  (iii) Engineering operations.
  (iv) Meter tests and repairs.
  (v) Emergencies during non-office hours.
  (f) An annual copy of the utility's construction budget,  which  shall   be 
updated for all major changes to generating and  transmission  facilities.
  (g) An "Electric Service" monthly  report,  on  forms   suitable   to   the 
commission, that shows information concerning   the   utility's   acquisition 
and disposition of electric energy and other information  as  required.   The 
reports shall be submitted by  investor-owned  utilities   within   50   days 
after the end of the quarter reported and by  rural   electric   cooperatives 
within 50 days after the end of the month reported.
  (h) A map or maps that show the utility's  operating   area   within   this 
state, including generating stations and  transmission   lines   with   their 
voltage designations. Upon a request by the commission  or   its   designated 
representative, the utility shall also make available a map  or   maps   that 
show all of the following:
  (i) Distribution lines with the number of phases designated.
  (ii) State boundary crossings.
  (iii) Service areas.

  History:  1983 AACS; 1996 AACS.


R 460.3204   Customer records; retention period; content.
  Rule 204. (1) The utility shall retain records as necessary to comply  with 
R 460.3309. The records shall be retained for not less than 3 years.
  (2) Records for customers shall show, if applicable, all of the   following 
information:
  (a) Kilowatt-hour meter reading.
  (b) Kilowatt-hour consumption.
  (c) Kilowatt, kilovolt ampere, and kilovar meter reading.
  (d) Kilowatt, kilovolt ampere, and kilovar measured demand.
  (e) Kilowatt, kilovolt ampere, and kilovar billing demand.
  (f) Total amount of bill.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



                        PART 3. METER REQUIREMENTS


R 460.3301   Metered measurement of electricity required; exceptions.
  Rule 301. (1) All electricity that is sold by a utility shall  be  on   the 
basis of meter measurement, except where the consumption   can   be   readily 
computed or except as provided for in a utility's filed rates.
  (2) Where practicable, the consumption of electricity within the utility or 
by administrative units associated with the utility shall  be  metered.
  (3) Meters shall be in compliance with part 6 of these rules.

  History:  1983 AACS; 1996 AACS.


R 460.3302   Rescinded.

  History:  1983 AACS; 1996 AACS.



R 460.3303   Meter reading data.
  Rule 303. The meter reading data shall  include  all   of   the   following 
information:
  (a) A suitable designation identifying the customer.
  (b) Identifying number or description of the meter, or both.
  (c) Meter readings or, if a reading was not taken, an  indication  that   a 
reading was not taken.
  (d) Any applicable multiplier or constant.

  History:  1983 AACS; 1996 AACS.


R 460.3304   Meter data collection system.
  Rule 304. A meter data collection system that takes  data  from   recording 
meters shall indicate all of the following:
  (a) The date of the record.
  (b) The equipment numbers.
  (c) A suitable designation identifying the customer.
  (d) The appropriate multipliers.

  History:  1983 AACS; 1996 AACS.


R 460.3305   Meter multiplier.
  Rule 305. If it  is  necessary  to  apply  a  multiplier   to   the   meter 
registration, then the multiplier shall be displayed on the   face   of   the 
meter.

  History:  1983 AACS; 1996 AACS.


R 460.3306   Rescinded.

  History:  1983 AACS; 1996 AACS; 2008 AACS.


R  460.3307   Rescinded.

  History:  1983 AACS; 1996 AACS.


R 460.3308   Standards of good practice; adoption by reference.
  Rule 308. In the absence of specific rules of the  commission,  a   utility 
shall apply the provisions of the publications set  forth  in  this  rule  as 
standards of accepted good practice.  The following standards  are  available 
from the American National Standards Institute (ANSI), Customer  Service,  25 
West 43rd St., 4th floor, New York, New York, 10036, USA,  telephone  number:
1-212-642-4900      or      via      the      internet      at      web-site:
http://webstore.ansi.org/ansidocstore/; at the cost listed below  as  of  the 
time of adoption of these rules, plus a handling charge (for paper copies):
  (a) American National Standards Institute standards for electricity  meters 
ANSI C12.1-2001 and C12.20-2002.  Cost $120.00.
  (b) American National Standards  Institute/American  Society  for   Quality 
Sampling Procedures and  Tables  for  Inspection  by  Variables  for  Percent 
Nonconforming (ANSI/ASQ Z1.9-2003).  Cost $100.00.
  (c) American National Standards Institute IEEE Standard  Requirements   for 
Instrument Transformers (ANSI C57.13-1993).  Cost $110.00.
  (d) American National Standards Institute IEEE Standard for High   Accuracy 
Instrument Transformers, IEEE Std. C57.13.6-2005.  Cost $35.00.
  (e) The standards adopted in subdivisions (a) to (d) of this rule are  also 
available for inspection at the  Michigan  Public  Service  Commission,  6545 
Mercantile Way, P.O. Box 30221, Lansing, Michigan, 48909.   Copies  of  these 
standards may also be obtained from the MPSC at the  cost  charged  by  ANSI, 
plus $20.00 for shipping and handling.

  History:  1996 AACS; 2008 AACS.


R 460.3309   Metering inaccuracies; billing adjustments.
  Rule 309. (1) An adjustment  of  bills  for  service  for  the  period   of 
inaccuracy shall be made for over registration and  may  be  made  for  under 
registration under any of the following conditions:
  (a) If a meter creeps.
  (b) If a metering installation is found upon any test to have  an   average 
inaccuracy of more than 2.0%.
  (c) If a demand metering installation is found upon any test  to  have   an 
average inaccuracy of more than 1.0% in addition to the inaccuracies  allowed 
under R 460.3609.
  (d) If a meter registration  has  been  found  to  be  inaccurate  due   to 
apparent tampering by a person or persons known or unknown.
  (2) The amount of the  adjustment  of  the  bills  for  service  shall   be 
calculated on the basis that the metering equipment  is  100%  accurate  with 
respect to the testing equipment used to make the test. The average  accuracy 
of watt-hour meters shall be calculated in accordance with R 460.3616.
  (3) If  the  date  when  the  inaccuracy  in  registration  began  can   be 
determined, then that date shall be the starting point  for  determining  the 
amount of the adjustment and shall be subject to subrule (12) of this rule.
  (4) If the date when  the  inaccuracy  in  registration  began  cannot   be 
determined, then it is assumed that the inaccuracy existed for the period  of 
time immediately preceding discovery of the inaccuracy that is equal  to  1/2 
of the time since the meter was installed on the present premises, 1/2 of the 
time since the last test, or 6 years, whichever is  the  shortest  period  of 
time, except as otherwise provided in subrule (5) of this rule and subject to 
subrule (12) of this rule.
  (5) The inaccuracy in registration due to creep  shall  be  calculated   by 
timing the rate of creeping  under  R  460.3607  and  by  assuming  that  the 
creeping affected the registration of  the  meter  for  the  period  of  time 
immediately preceding discovery of the inaccuracy that is equal to 1/4 of the 
time since the meter was installed on the present premises, 1/4 of  the  time 
since the last test, or 6 years, whichever is the shortest  period  of  time, 
subject to subrule (12) of this rule.
  (6) If the average inaccuracy cannot be determined by test  because   part, 
or all, of the metering equipment is inoperative, then the  utility  may  use 
the registration of check metering installations, if  any,  or  estimate  the 
quantity of energy consumed based  on  available  data.   The  utility  shall 
advise the customer of the metering equipment failure and of  the  basis  for 
the estimate of the quantity billed. The same periods of inaccuracy shall  be 
used as explained in this rule.
  (7) Recalculation of bills shall be  on  the  basis  of  the   recalculated 
monthly consumption.
  (8) If the recalculated bills indicate that an amount is due  an   existing 
customer or that more than $10.00 is due a former customer  of  the  utility, 
then the utility shall refund the full amount of the difference  between  the 
amount paid and the recalculated amount.
  (9) Refunds shall be made to the 2  most  recent  customers  who   received 
service through the meter found to be inaccurate. If a former customer of the 
utility, a notice of the amount  of  the  refund  shall  be  mailed  to  such 
customer at the last known address. The utility shall, upon  demand  made  by 
the customer within 3 months of mailing of the notice, forward the refund  to 
the customer.
  (10) If the recalculation of billing as a result of a metering   inaccuracy 
indicates that more than $1.00 is owed to the utility by an existing customer 
or that more than $10.00 is owed to the utility by a  former  customer,  then 
the utility may issue a bill for the amount, subject to subrule (12) of  this 
rule.
  (11) Each utility may establish a policy  setting  a  minimum  amount   for 
which it may bill a customer due to under registration that is more than  the 
amounts in subrule (10) of this rule. The minimum amount established  in  the 
utility policy shall be  applied  in  all  cases  of  under  registration  to 
determine whether the customer will be billed for the amount due the  utility 
because of under registration.
  (12) Except in cases of tampering, back billing of customers for   metering 
inaccuracies is limited to the 2-year period immediately preceding  discovery 
of the inaccuracy. The customer shall be given a reasonable time in which  to 
pay the amount of the back billing, after consideration of the amount of  the 
back bill and the duration of the inaccuracy, and service shall not  be  shut 
off during this time for nonpayment of the amount of the back billing if  the 
customer is complying with the repayment agreement.

  History: 2008 AACS.


                        PART 4. CUSTOMER RELATIONS


R 460.3401   Rescinded.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



R 460.3402   Rescinded.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



R 460.3403   Rescinded.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



R 460.3404   Rescinded.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



R 460.3405   Rescinded.

  History:  1983 AACS; 1996 AACS.



R 460.3406   Rescinded.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



R 460.3407   Rescinded.

  History:  1983 AACS; 1996 AACS; 2008 AACS.



R 460.3408   Temporary service; cost of installing  and  removing   equipment 
owned by utility.
  Rule 408. If the utility renders temporary service  to   a   customer,   it 
shall require that the customer bear the cost of  installing   and   removing 
the utility-owned equipment in excess of any salvage realized.

  History:  1983 AACS; 1996 AACS.


R 460.3409   Protection  of   utility-owned    equipment    on     customer's 
premises.
  Rule 409. (1) The customer shall use  reasonable   diligence   to   protect 
utility-owned  equipment  on  the  customer's  premises   and   to    prevent 
tampering or interference with the equipment. The  utility   may   shut   off 
service in accordance with applicable  rules  of  the   commission   if   the 
metering or wiring on the customer's premises has been   tampered   with   or 
altered in any manner that allows unmetered or improperly  metered  energy to 
be used or to cause an unsafe condition.
  (2) If a utility shuts off service for unauthorized use  of  service,  then 
both of the following provisions shall apply:
  (a) The utility may bill the customer for the unmetered  energy  used   and 
any damages that have been caused to utility-owned equipment.
  (b) The utility is not required to restore service   until   the   customer 
does all of the following:
  (i)  Makes  reasonable  arrangements  for  payment  of   the   charges   in 
subdivision (a) of this subrule.
  (ii) Agrees to pay the approved reconnection charges.
  (iii)  Agrees  to  make  provisions  and  pay   charges   for    relocating 
utility-owned equipment or making other reasonable  changes   that   may   be 
requested by the utility to provide better protection for  its  equipment.
  (iv) Provides the utility with reasonable assurance   of   the   customer's 
compliance with the utility's approved standard rules and regulations.
  (3) Failure to comply with the terms of an agreement  to  restore   service 
after service has been shut off pursuant to subrule (1) of this rule shall be 
cause to shut off service in accordance with the rules of  the   utility  and 
the commission.
  (4) If service is shut off pursuant to subrule (3) of this  rule  and   the 
utility must incur extraordinary  expenses  to   prevent   the   unauthorized 
restoration of  service,  the  utility  may  bill  the   customer   for   the 
expenses, in addition to all other charges that may apply  under  this  rule, 
and may require that  the  expenses  and  other  charges   be   paid   before 
restoring service. A  reasonable  effort  shall  be  made   to   notify   the 
customer at the time of shutoff that additional charges may   apply   if   an 
attempt is made to restore service that has been shut off.
  (5) The customer of record who benefits from the unauthorized use  shall be 
responsible for payment to the utility for the energy consumed.
  (6) The utility may bill the customer for the reasonable  actual  cost   of 
the tampering investigation.

  History:  1983 AACS; 1996 AACS.


R 460.3410   Extension of facilities plan.
  Rule 410. Each utility shall develop a plan, approved  by  the  commission, 
for the extensions of facilities where the investment is in  excess  of  that 
included in the regular rates for service and for which   the   customer   is 
required to pay all or part of the cost.

  History:  1983 AACS; 1996 AACS.


R 460.3411   Extension of electric service in areas served by  2   or    more 
utilities.
  Rule 411. (1) As used in this rule:
  (a) "Customer" means the buildings and facilities served  rather  than  the 
individual, association, partnership, or corporation served.
  (b) "Distances"  means  measurements  which  are   determined   by   direct 
measurement from the closest point of a   utility's   existing   distribution 
facilities to the customer's meter location and which are  not  determined by 
the circuit feet involved in any extension.
  (c) "Distribution facilities" means single-phase,  V-phase,   and   3-phase 
facilities and does not include service drops.
  (2) Existing customers shall not transfer from one utility  to  another.
  (3) Prospective customers for  single-phase  service   that   are   located 
within 300 feet of the distribution facilities  of  2   or   more   utilities 
shall have the service of their choice.
  (4) Prospective customers for single-phase service that  are  located  more 
than 300 feet, but within 2,640 feet, from the distribution facilities  of  1 
or more utilities shall be served by the closest utility.
  (5) Prospective customers for single-phase service that  are  located  more 
than 2,640 feet from the distribution facilities of any  utility  shall  have 
the service of their choice, subject to the provisions of  subrule  (10)   of 
this rule.
  (6) Prospective customers for 3-phase service that   are   located   within 
300 feet of the 3-phase distribution facilities of  2   or   more   utilities 
shall have the service of their choice.
  (7) Prospective customers for 3-phase service that are  located  more  than 
300 feet, but within 2,640 feet, from the 3-phase distribution  facilities of 
1 or more utilities shall be served by the closest utility.
  (8) Prospective customers for 3-phase service that are  located  more  than 
2,640 feet from the 3-phase distribution facilities of  any   utility   shall 
have the service of their choice, subject to  the   provisions   of   subrule 
(10) of this rule.
  (9) Regardless of any other provisions in  these   rules,   a   prospective 
industrial  customer,  as  defined  under   the   industrial   classification 
manual, division D, manufacturing, for 3-phase service that   will   have   a 
connected load of more than 500 kilowatts shall have its  choice  of  service 
from any nearby  utility  that  is  willing  to   construct   the   necessary 
facilities. The facilities that are constructed  to   serve   an   industrial 
customer that would otherwise have been served by   another   utility   shall 
not qualify as a measuring point in determining which  utility   will   serve 
new customers in the future.
  (10) The extension of distribution facilities,  except   as   provided   in 
subrules (3), (4), (6), and (7) of this rule, where an  extension   will   be 
located within 1 mile of another utility's  distribution  facilities,   shall 
not be made by a utility without  first  giving  the   commission   and   any 
affected utility 10 days' notice of its  intention  by   submitting   a   map 
showing the location of the  proposed  new   distribution   facilities,   the 
location of the prospective customers, and the location of the  facilities of 
any other utility in  the  area.   If   no   objections   to   the   proposed 
extension of distribution facilities are received by  the  commission  within 
the 10-day notice  period,  the  utility  may  proceed   to   construct   the 
facilities. If objections are received, the determination  of  which  utility 
will extend service may be made the subject of  a  public   hearing   and   a 
determination by the commission, upon proper application  by   any   affected 
party.
  (11) The first utility serving a customer pursuant  to   these   rules   is 
entitled to serve the  entire  electric  load  on  the   premises   of   that 
customer even if another utility is closer to a portion  of  the   customer's 
load.
  (12) A utility may waive its rights to serve  a  customer   or   group   of 
customers if another utility is willing and able to  provide   the   required 
service and if the commission is notified and has no objections.
  (13) Nothing contained in these rules shall be  construed   to   circumvent 
the requirements of Act No. 69 of the Public Acts  of   1929,   as   amended, 
being S460.501 et seq. of the Michigan Compiled Laws, or   to   authorize   a 
utility to extend its service into a municipality  then   being   served   by 
another utility without complying with the provisions of Act No.  69  of  the 
Public Acts of 1929, as amended.
  (14) Regardless of other provisions of this rule, except  subrule  (9),   a 
utility shall not extend service to a new customer in a  manner   that   will 
duplicate  the  existing  electric  distribution   facilities   of    another 
utility,  except  where  both  utilities  are  within  300   feet   of    the 
prospective customer. Three-phase service does  not  duplicate   single-phase 
service when extended to serve a 3-phase customer.
  (15) The first utility to serve a customer in a   new   subdivision   under 
the other provisions of this rule  has  the  right  to   serve   the   entire 
subdivision. In extending service to reach the   subdivision,   the   utility 
shall not duplicate the existing facilities of another utility.

  History:  1983 AACS; 1996 AACS.


                            PART 5. ENGINEERING

R 460.3501   Electric plant; construction,  installation,  maintenance,   and 
operation pursuant to good engineering practice required.
  Rule 501. The electric  plant  of  the  utility   shall   be   constructed, 
installed, maintained, and operated pursuant to  accepted  good   engineering 
practice in  the  electric  industry  to  assure,  as   far   as   reasonably 
possible, continuity of service, uniformity  in  the   quality   of   service 
furnished, and the safety of persons and property.

  History:  1983 AACS.


R 460.3502   Standards of good practice; adoption by reference.
  Rule 502. In the absence of specific rules of the  commission,  a   utility 
shall apply the standards of accepted good practice that   are   adopted   by 
reference in R 460.811 et seq.

  History:  1983 AACS; 1988 AACS; 1996 AACS. 


R 460.3503   Utility plant capacity.
  Rule 503. The electric capacity regularly  available   from   all   sources 
shall be large enough to meet  all  normal  demands  for   service   and   to 
provide a reasonable reserve for emergencies.

  History:  1983 AACS; 1996 AACS.


R 460.3504   Electric plant inspection program.
  Rule 504. Each utility shall  adopt  a  program  of   inspection   of   its 
electric plant to ensure safe and reliable operation. The  frequency  of  the 
various inspections  shall  be  based  on  the   utility's   experience   and 
accepted good practice. Each utility  shall  keep   sufficient   records   to 
verify compliance with its inspection program.

  History:  1983 AACS; 1996 AACS.


R 460.3505    Utility line clearance program.
   Rule 505.  Each utility shall adopt a program of maintaining adequate line 
clearance  through  the  use  of  industry-recognized  guidelines.   A   line 
clearance program shall recognize the national electric safety code standards 
that are adopted by reference in R 460.811 et seq.  The program shall include 
tree trimming.

  History:  1996 AACS.


             PART 6. METERING EQUIPMENT INSPECTIONS AND TESTS

R 460.3601   Customer-requested meter tests.
  Rule 601. (1) Upon request by a customer to a utility,  a   utility   shall 
make a test of the meter serving the customer. Any charge  to  the   customer 
shall conform with the utility's  filed  and  approved  rates  and  rules.
Provided, however, that the utility need not make more than 1  test  in   any 
12-month period.
  (2) The customer, or his or her representative, may be present when  his or 
her meter is tested.
  (3) A report of the results of the test shall be made   to   the   customer 
within a reasonable time after the completion of the test, and  a  record  of 
the report, together with a complete record of each test, shall  be  kept  on 
file at the office of the utility.

  History:  1983 AACS.


R 460.3602 Meter and associated device inspections and  tests;  certification 
of accuracy.
   Rule 602.  Every meter shall  be  inspected  and  tested,  and  associated 
device(s) shall be inspected, in the meter shop of the utility,  or  a  meter 
testing facility certified by the utility, before being  placed  in  service. 
The accuracy of each meter shall be certified to  be  within  the  tolerances 
permitted  by  these  rules,  except  that  the  utility  may  rely  on   the 
certification of accuracy by the manufacturer on all new meters.

  History:  1983 AACS; 2008 AACS.


R  460.3603   Meters  with   transformers;   post-installation    inspection; 
exception.
  Rule 603. Meters  with  associated  instrument   transformers   and   phase 
shifting transformers shall be inspected to determine  the  proper  operation 
and wiring connections. Inspections shall be made  within   60   days   after 
installation by a qualified person who, when possible,  should   be   someone 
other than the original installer. All  self-contained,  socket-type   meters 
are excluded from post-installation inspections, except  that  the   original 
installation shall be inspected when the meter is installed.

  History:  1983 AACS.


R  460.3604   Meters and associated devices; removal tests.
  Rule 604. All meters and associated devices shall be  tested   after   they 
are removed from service unless they are retired because of  obsolescence.

  History:  1983 AACS; 1995 AACS.


R 460.3605 Metering electrical quantities.
   Rule 605.  (1) All  electrical  quantities  that  are  to  be  metered  as 
provided  in  R  460.3301  shall  be  metered  by   commercially   acceptable 
instruments which are owned and maintained by the utility.
   (2) Every reasonable effort shall be made to measure at 1  point  all  the 
electrical quantities necessary for billing a customer under a given rate.
   (3) Metering facilities located at any point  where  energy  may  flow  in 
either direction and where the  quantities  measured  are  used  for  billing 
purposes shall consist of meters equipped with ratchets or other  devices  to 
prevent reverse registration and shall be so connected as to separately meter 
the energy flow in each direction, unless used to implement a utility  tariff 
approved by the commission for service provided under a net metering program.
   (4) Reactive metering shall not be employed for  determining  the  average 
power factor for billing purposes where energy may flow in  either  direction 
or where the customer may generate an appreciable amount of his or her energy 
requirements at any time, unless suitable directional relays and ratchets are 
installed to obtain correct registration under all conditions of operation.
   (5) All electric service of the same type rendered  under  the  same  rate 
schedule shall be  metered  with  instruments  having  like  characteristics, 
except that the commission may be requested to approve the use of instruments 
of  different  types  if  their  use  does   not   result   in   unreasonable 
discrimination. Either all of the reactive meters which may run backwards  or 
none of the reactive  meters  used  for  measuring  reactive  power  under  1 
schedule shall be ratcheted.

  History:  1983 AACS; 2008 AACS.


R  460.3606   Nondirect  reading  meters   and    meters    operating    from 
instrument transformers; marking of multiplier on  instruments;   marking  of 
charts and   magnetic   tapes;   marking   of   register   ratio   on   meter 
registers; watthour constants.
  Rule 606. (1) Meters that are not direct reading   and   meters   operating 
from instrument transformers shall have the multiplier  plainly   marked   on 
the dial of the instrument or otherwise suitably marked.   All   charts   and 
magnetic tapes taken from recording meters shall be marked with  the  date of 
the record, the meter number,  customer,  and  chart  multiplier,  except  as 
provided in R 460.3304.
  (2) The register ratio shall be marked on all meter registers.
  (3) The watthour constant for the meter itself shall  be   shown   on   all 
watthour meters.

  History:  1983 AACS.


R 460.3607 Watt-hour meter requirements.
   Rule 607.  (1) Watthour meters that  are  used  for  measuring  electrical 
quantities supplied shall conform to ANSI specifications and meet all of  the 
following requirements:
   (a) Be of proper design for the circuit on which the meters are  used;  be 
in good mechanical and electrical condition; and  have  adequate  insulation, 
correct internal connections, and correct register.
   (b) Not creep at no load with all load wires disconnected at a rate of one 
complete revolution of the moving element in ten minutes  when  potential  is 
impressed.
   (c) Be accurate to within plus or minus 1.0%,  referred  to  the  portable 
standard watthour meter as a base, at two unity  power  factor  loads:  light 
load (l.l.) and heavy load (h.l.).

Meter Must be Accurate within ± 1.0% to Portable Standard

Meter Class

Light Load
Test Amperes

Heavy Load
Test Amperes

Inductive Load
50% Lagging Power Factor
Test Amperes

Self-Contained

10% Rated Test Amperes of Meter

75-100% Rated Test Amperes of Meter

75-100% Rated Test Amperes of Meter

Transformer Rated

5-10% Rated Test Amperes of Meter

75-100% Rated Test Amperes of Meter

75-100% Rated Test Amperes of Meter

(d) Be accurate to within plus or minus 2.0%, referred to the portable standard watthour meter as a base, at inductive load (i.l.). (2) Polyphase meters shall have their elements in balance within 2.0% at rated test amperes at unity power factor and at approximately 50% lagging power factor. (3) Meters that are used with instrument transformers shall be adjusted so that the overall accuracy of the metering installation meets the requirements of this rule. (4) Meters and associated devices shall be adjusted as close as practical to zero error and within the accuracy limits specified in subrule (1)(c) of this rule. History: 1983 AACS; 2008 AACS. R 460.3608 Demand meters, registers, and attachments; requirements. Rule 608. A demand meter, demand register, or demand attachment that is used to measure a customer's service shall meet all of the following requirements: (a) Be in good mechanical and electrical condition. (b) Have proper constants, indicating scale, contact device, recording tape or chart, and resetting device. (c) Not register at no load. (d) Be accurate to the following degrees: (i) Curve-drawing meters that record quantity-time curves and integrated-demand meters shall be accurate to within plus or minus 2.0% of full scale throughout their working range. Timing elements measuring specific demand intervals shall be accurate to within plus or minus 2.0%, and the timing element which serves to provide a record of the time of day when the demand occurs shall be accurate to within plus or minus 4 minutes in 24 hours. (ii) Lagged-demand meters shall be accurate to within plus or minus 4.0% of full scale at final indication. History: 1983 AACS. R 460.3609 Instrument transformers used in conjunction with metering equipment; requirements; phase shifting transformers; secondary voltage. Rule 609. (1) Instrument transformers used in conjunction with metering equipment to measure a customer's service shall meet both of the following requirements: (a) Be in proper mechanical condition and have satisfactory electrical insulation for the service on which used. (b) Have characteristics such that the combined inaccuracies of all transformers supplying 1 or more meters in a given installation will not exceed the percentages listed in the following chart: 100% Power 50% Factor Power Factor Current 10% 100% 10% 100% Error 1% 0.75% 3% 2% (2) Meters that are used in conjunction with instrument transformers shall be adjusted so that the overall accuracies will come within the limits specified in this part. (3) Instrument transformers shall be tested with the meter with which they are associated by making an overall test or may be checked separately. If the transformers are tested separately, the meters shall also be checked to see that the overall accuracy of the installation is within the prescribed accuracy requirements. (See R 460.3613 (6).) (4) The results of tests of instrument transformers shall be kept on record and shall be available for use. (5) Phase shifting transformers shall have secondary voltages under balanced line voltage conditions within plus or minus 1.0% of the voltage impressed on the primary side of the transformer. History: 1983 AACS; 2008 AACS. R 460.3610 Portable indicating voltmeters; accuracy. Rule 610. All portable indicating voltmeters that are used for determining the quality of service voltage to customers shall be checked against a suitable secondary reference standard at least once every 6 months for analog devices, and once every 12 months for digital devices. The accuracy of these voltmeters shall be rated so that the error of the indication is not more than plus or minus 1% of full scale. If the portable indicating voltmeter is found to be in error by more than the rated accuracy at commonly used scale deflections, it shall be adjusted. History: 1983 AACS; 2008 AACS. R 460.3611 Meter testing equipment; availability; provision and use of primary standards. Rule 611. (1) A utility shall maintain sufficient laboratories, meter testing shops, secondary standards, instruments, and facilities to determine the accuracy of all types of meters and measuring devices used by the utility. The utility may, if necessary, have all or part of the required tests made, or its portable testing equipment checked, by another utility or agency which is approved by the commission and which has adequate and sufficient testing equipment to comply with these rules. (2) At a minimum, a utility shall keep all of the following testing equipment available: (a) One or more portable standard watthour meters that has a capacity and voltage range which is adequate to test all watthour meters used by the utility. (b) Portable indicating instruments that are necessary to determine the accuracy of all instruments used by the utility. (c) One or more secondary standards to check each of the various types of portable standard watthour meters used for testing watthour meters. Each secondary standard shall consist of an approved portable standard watthour meter which is kept permanently at 1 point and which is not used for fieldwork. Standards shall be well-compensated for both classes of temperature errors, shall be practically free from errors due to ordinary voltage variations, and shall be free from erratic registration due to any cause. (d) Suitable standards, which are not used for fieldwork, to check portable instruments used in testing. (3) A utility shall provide and use primary standards that have accuracies which are traceable to the United States National Institute of Standards and Technology (NIST). History: 1983 AACS; 1995 AACS. R 460.3612 Test standards; accuracy. Rule 612. (1) The accuracies of all primary reference standards shall be certified as traceable to the National Institute of Standards and Technology (NIST), either directly or through other recognized standards laboratories. These standards shall have their accuracy certified at the time of purchase. Standard cells shall be intercompared regularly and at least 1 standard cell shall be checked by a standardizing laboratory at intervals of not more than 2 years. Reference standards of resistance, potentiometers, and volt boxes shall be checked at intervals of not more than 3 years. (2) Secondary watthour meter standards shall not be in error by more than plus or minus 0.3% at loads and voltages at which they are to be used, and shall not be used to check or calibrate working standards, unless the secondary standard has been checked and adjusted, if necessary, within the preceding 6 months. Each secondary standard watthour meter shall have calibration data available and shall have a history card. (3) Secondary standards indicating instruments shall not be in error by more than plus or minus 0.5% of indication at commonly used scale deflection and shall not be used to check or calibrate portable indicating instruments, unless the secondary standard has been checked and adjusted, if necessary, within the preceding 12 months. A calibration record shall be maintained for each standard. (4) Regularly used working portable standard watthour meters shall be compared with a secondary standard at least once every 6 months. Infrequently used working standards shall be compared with a secondary standard before they are used. (5) Working portable standard watthour meters shall be adjusted so that their percent registration is within 99.7% and 100.3% at 100% power factor and within 99.5% and 100.5% at 50% lagging power factor at all voltages and loads at which the standard may be used. A history and calibration record shall be kept for each working standard. (6) The meter accuracies required in this rule for all primary, secondary, and working standards shall be referred to 100%. Service measuring equipment shall be adjusted to within the accuracies required assuming the portable test equipment to be 100% accurate with the calibration correction taken into consideration. History: 1983 AACS; 1995 AACS; 2008 AACS. R 460.3613 Metering equipment testing requirements. Rule 613. (1) The testing of any unit of metering equipment shall consist of a comparison of its accuracy with a standard of known accuracy. Units which are not properly connected or which do not meet the accuracy or other requirements of these meter and metering equipment rules at the time of testing shall be reconnected or rebuilt to meet such requirements and shall be adjusted to within the required accuracy and as close to zero error as practicable or else their use shall be discontinued. (2) Self-contained, single-phase meters, except for combination meters (meters that include demand devices or control devices), shall be in compliance with all of the following requirements: (a) Be checked for accuracy at unity power factor at the point where a meter is installed, at a central testing point, or in a mobile testing laboratory within a period of from 12 months before, to 60 days after, a meter is placed in service, except as provided for in R 460.3602, and in subrule (3) of this rule, and not later than 9 months after 192 months of service for a surge-resistant meter and not later than 9 months after 96 months of service for a non-surge-resistant meter. (b) Notwithstanding the provisions of subdivision (a) of this subrule, upon application to the commission and upon receipt of an order granting approval, the testing of self-contained, single-phase meters in service shall be governed by a quality control plan as follows: (i) Meters shall be divided into homogeneous groups by manufacturers' types, except as follows: (A) Certain manufacturers' types shall be further subdivided into separate groups by manufacturers' serial numbers as follows: (1) General Electric type I-30 shall be divided at serial number 20,241,829. (2) Westinghouse type C shall be divided at serial number 16,350,000. (3) Duncan type MF shall be divided at serial number 2,650,000. (4) Sangamo type J meters shall be divided starting with serial number 10,000,000. (B) Non-surge-resistant meters that are installed in nonurban areas shall be treated as separate groups by manufacturers' type. (ii) The meters in each homogeneous group shall then be further subdivided into lots of not less than 301, and not more than 10,000, meters each, except that meters of the most recent design may be combined into lots regardless of manufacturers' type, except that where the number of meters of a single type is 8,001 or more, that number of meters shall be segregated by types for the formation of lots. (iii) From each assembled lot, a sample of the size specified in table A-2, ANSI/ASQC Z1.9, shall be drawn annually. The sample shall be drawn at random. (iv) The meters in each sample shall be tested for accuracy pursuant to the provisions of these rules. (v) The test criteria for acceptance or rejection of each lot shall be based on the test at heavy load only and shall be that designated for double specification limits and an acceptable quality level (AQL) that is not higher than 2.50 (normal inspection) as shown in table B-3, ANSI/ASQC Z1.9. (vi) The necessary calculations shall be made pursuant to Example B-3 of ANSI/ASQC Z1.9. The upper and lower specification limits, U and L, shall be 102% and 98%, respectively. (vii) A lot shall be rejected if the total estimated percent defective (p) exceeds the appropriate maximum allowable percent defective (M) as determined from table B-3 as specified in paragraph (v) of this subdivision. (viii) All meters in a rejected lot shall be tested within a maximum period of 48 months and shall be adjusted pursuant to the provisions of R 460.3607 or shall be replaced with meters that are in compliance with the requirements of R 460.3607. (ix) During each calendar year, new meter samples shall be drawn as specified in this subdivision from all meters in service, with the exception that lots that have been rejected shall be excluded from the sampling procedure until all meters included in the rejected lots have been tested. (x) The utility may elect to adopt a mixed variables-attributes sampling plan as outlined in Section A9 of ANSI/ASQC Z1.9, in which case, a lot that is not in compliance with the acceptability criteria of the variables sampling plan shall be resampled the following year using an attributes sampling plan. If the acceptability criteria of the attributes sampling plan are met, then the lot shall be considered acceptable and shall be returned to the variables sampling plan the following year. If the acceptability criteria of the attributes sampling plan are not met, then that lot shall be rejected and all meters in the lot shall be tested and adjusted or replaced within a maximum period of 36 months after the second rejection. (xi) The plan specified in paragraph (x) of this subdivision does not alter the rules under which customers may request special tests of meters. (c) Be checked for accuracy in all of the following situations: (i) When a meter is suspected of being inaccurate or damaged. (ii) When the accuracy of a meter is questioned by a customer. (See R 460.3601.) (iii) Before use if a meter has been inactive for more than 1 year after having been in service. (iv) When a meter has been removed from service and has not been tested within the previous 48 months. (d) Be inspected for mechanical and electrical faults when the accuracy of the device is checked. (e) Have the register and the internal connections checked before the meter is first placed in service and when the meter is repaired. (f) Have the connections to the customer's circuits checked when the meter is tested on the premises or when removed for testing. (g) Be checked for accuracy at 50% power factor when purchased and after rebuilding. (h) A meter need not be tested or checked for any reason, except when a complaint is received, if the device was tested, checked, and adjusted, if necessary, within the previous 12 months. (3) Notwithstanding the provisions of subrules (4)(a)(ii), (5)(a) (ii) and (6)(a)(iii) of this rule, upon application to the commission and upon receipt of an order granting approval, the solid state meters described in subrules (4), (5) and (6) of this rule in service may elect to be governed by a quality control plan as follows: (a) Meters shall be divided into homogeneous groups by manufacturers' types. (b) The meters in each homogeneous group shall then be further subdivided into lots of not less than 301, and not more than 10,000, meters each, except that meters of the most recent design may be combined into lots regardless of manufacturers' type, except that where the number of meters of a single type is 8,001 or more, that number of meters shall be segregated by types for the formation of lots. (c) From each assembled lot, a sample of the size specified in table A-2, ANSI/ASQC Z1.9, shall be drawn annually. The sample shall be drawn at random. (d) The meters in each sample shall be tested for accuracy pursuant to the provisions of these rules. (e) The test criteria for acceptance or rejection of each lot shall be based on the test at heavy load only and shall be that designated for double specification limits and an acceptable quality level (AQL) that is not higher than 2.50 (normal inspection) as shown in table B-3, ANSI/ASQC Z1.9. (f) The necessary calculations shall be made pursuant to Example B-3 of ANSI/ASQC Z1.9. The upper and lower specification limits, U and L, shall be 102% and 98%, respectively. (g) A lot shall be rejected if the total estimated percent defective (p) exceeds the appropriate maximum allowable percent defective (M) as determined from table B-3 as specified in paragraph (e) of this subdivision. (h) All meters in a rejected lot shall be tested within a maximum period of 48 months and shall be adjusted pursuant to the provisions of R 460.3607 or shall be replaced with meters that are in compliance with the requirements of R 460.3607. (i) During each calendar year, new meter samples shall be drawn as specified in this subdivision from all meters in service, with the exception that lots that have been rejected shall be excluded from the sampling procedure until all meters included in the rejected lots have been tested. (j) The utility may elect to adopt a mixed variables-attributes sampling plan as outlined in Section A9 of ANSI/ASQC Z1.9, in which case, a lot that is not in compliance with the acceptability criteria of the variables sampling plan shall be resampled the following year using an attributes sampling plan. If the acceptability criteria of the attributes sampling plan are met, the lot shall be considered acceptable and shall be returned to the variables sampling plan the following year. If the acceptability criteria of the attributes sampling plan are notmet, then that lot shall be rejected and all meters in the lot shall be tested and adjusted or replaced within a maximum period of 36 months after the second rejection. (k) The plan specified in paragraph (j) of this subdivision does not alter the rules under which customers may request special tests of meters. (4) All single-phase meters that are not included in the provisions of subrule (2) of this rule, together with associated equipment, such as demand devices, control devices and instrument transformer-rated meters, shall be in compliance with all of the following requirements: (a) Be checked for accuracy at unity power factor at the point where a meter is installed, at a central testing point, or in a mobile testing laboratory as follows: (i) Within a period of from 12 months before, to 60 days after, a meter is placed in service, exceptions to this subrule (4)(a) of this rule are as provided for in R 460.3602 and for solid state meters. (ii) Not later than 9 months after 144 months of service for a surge-resistant meter and not later than 9 months after 96 months of service for a non-surge-resistant meter. (iii) When a meter is suspected of being inaccurate or damaged. (iv) When the accuracy of a meter is questioned by a customer. (See R 460.3601.) (v) Before use when a meter has been inactive for more than 1 year after having been in service. (vi) When a meter is removed from service and has not been tested within a period equal to 1/2 of the normal test schedule. (b) Be inspected for mechanical and electrical faults when the accuracy of the device is checked. (c) Have the register and the internal connections checked before the meter is first placed in service and when the meter is repaired. (d) Have the connections to the customer's circuits checked when the meter is tested on the premises or when removed for testing. (e) Be checked for accuracy at 50% power factor when purchased and after rebuilding. (f) A meter need not be tested or checked for any reason, except when a complaint is received, if the device was tested, checked and adjusted, if necessary, within the previous 12 months. (5) All self-contained, 3-phase meters and associated equipment shall be in compliance with all of the following requirements: (a) Be tested for accuracy at unity and 50% power factor as follows: (i) Before being placed in service. (ii) Not later than 9 6 months after 120 months of service. (iii) When a meter is suspected of being inaccurate or damaged. (iv) When the accuracy of a meter is questioned by a customer. (See R 460.3601.) (v) When a meter is removed from service. (b) Be inspected for mechanical and electrical faults when the accuracy is checked. (c) Have the register and internal connections checked before the meter is first installed, when repaired and when the register is changed. (d) Have the connections to the customer's circuits and multipliers checked when the equipment is tested for accuracy on the customer's premises. (6) All transformer-rated, 3-phase meters and associated equipment shall be in compliance with all of the following requirements: (a) Be checked for accuracy at unity and 50% power factor as follows: (i) Before being placed in service. (ii) On the customer's premises within 60 days after installation, unless the transformers are in compliance with the specifications outlined in the American National Standards Institute standard ANSI C-57.13, and unless the meter adjustment limits do not exceed plus or minus 1.5% at 50% power factor. (iii) Not later than 9 months after 72 months of service. (iv) When a meter is suspected of being inaccurate or damaged. (v) When the accuracy is questioned by a customer. (See R 460.3601.) (vi) When a meter is removed from service. (b) Be inspected for mechanical and electrical faults when the accuracy is checked. (c) Have the register and internal connections checked before the meter is first placed in service and when the meter is repaired. (d) Have the connections to the customer's circuits and multipliers checked when the equipment is tested for accuracy on the premises or when removed for testing and when instrument transformers are changed. (e) Be checked for accuracy at 50% power factor when purchased and after rebuilding. (7) Instrument transformers shall be tested in all of the following situations: (a) When first received, unless a transformer is accompanied by a certified test report by the manufacturer. (b) When removed from service. (c) Upon complaint. (d) When there is evidence of damage. (e) When an approved check, such as the variable burden method in the case of current transformers that is made when the meter is tested indicates that a quantitative test is required. (8) Demand meters shall be in compliance with both of the following requirements: (a) Be tested for accuracy in all of the following situations: (i) Before a meter is placed in service. (ii) When an associated meter is tested and the demand meter is a block interval nonrecording type or a thermal type. (iii) After 2 years of service if the meter is of the recording type, but testing is not required if the meter is of the pulse-operated type and the demand reading is checked with the kilowatt-hour reading each billing cycle. (iv) When a meter is suspected of being inaccurate or damaged. (v) When the accuracy is questioned by a customer. (See R 460.3601.) (vi) When a meter is removed from service. (b) Be inspected for mechanical and electrical faults when a meter is tested in the field or in the meter shop. History: 1983 AACS; 1995 AACS; 2008 AACS. R 460.3614 Standards check by the commission. Rule 614. (1) Upon request of the commission, a utility shall submit 1 of its portable standard watthour meters and 1 portable indicating voltmeter, ammeter, and wattmeter to a commission-approved standards laboratory for checking of their accuracy. (2) A utility shall normally check its own working portable standard watthour meters or instruments against primary or secondary standards and shall calibrate these working standards or instruments before they are submitted with a record of such calibration attached to each of the working standards or instruments. History: 1983 AACS. R 460.3615 Metering equipment records. Rule 615. (1) A complete record of the most recent test of all metering equipment shall be maintained. The record shall show all of the following information: (a) Identification and location of unit. (b) Equipment with which the device is associated. (c) The date of test. (d) Reason for the test. (e) Readings before and after the test. (f) A statement as to whether or not the meter creeps and, in case of creeping, the rate. (g) A statement of meter accuracies before and after adjustment sufficiently complete to permit checking of the calculations employed. (h) Indications showing that all required checks have been made. (i) A statement of repairs made, if any. (j) Identification of the testing standard and the person making the test. (2) The utility shall also keep a record of each unit of metering equipment which shows all of the following information: (a) When the unit was purchased. (b) The unit's cost. (c) The company's identification. (d) Associated equipment. (e) Essential nameplate date. (f) The date of the last test. The record shall also show either the present service location with the date of installation or, if removed from service, the service location from which the unit was removed with the date or removal. History: 1983 AACS. R 460.3616 Average meter error; determination. Rule 616. If a metering installation is found upon any test to be in error by more than 2% at any test load, the average error shall be determined in 1 of the following ways: (a) If the metering installation is used to measure a load which has practically constant characteristics, such as a streetlighting load, the meter shall be tested under similar conditions of load and the accuracy of the meter "as found" shall be considered as the average accuracy. (b) If a single-phase metering installation is used on a varying load, the average error shall be the weighted algebraic average of the error at light load and the error at heavy load, the latter being given a weighting of 4 times the former. (c) If a polyphase metering installation is used on a varying load, the average error shall be the weighted algebraic average of its error at light load given a weighting of 1, its error at heavy load and 100% power factor given a weighting of 4, and at heavy load and 50% lagging power factor given a weighting of 2. (d) If a load, other than the light, heavy, and low power factor load specified for routine testing, is more representative of the customary use of the metering equipment, its error at that load shall also be determined. In this case, the average error shall be computed by giving the error at such load and power factor a weighting of 3 and each of the errors at the other loads (light, heavy, and 50% lagging power factor) a weighting of 1. Each error shall be assigned its proper sign. History: 1983 AACS. R 460.3617 Reports to be filed with the commission. Rule 617. (1) A utility shall file, with the commission, within 30 days after the first day of January of each year, an officer-certified statement that the utility has complied with all of the requirements set forth in these rules relating to meter standardizing equipment. (2) For all meters that are not included in the provisions of R 460.3613(2)(b), the utility shall file, with the commission, on or before the first day of April of each year, its annual tabulation of all of its prior-to-adjustment meter test results covering the 12-month period ending December 31. The utility shall summarize, by meter type, all individual meters and overall light and heavy load prior-to-adjustment test results at the power factors required by these rules. The summary shall be divided into heavy load 100% power factor, light load 100% power factor, and heavy load 50% power factor test results and shall also be divided according to the length of meter test period and types of single-phase and polyphase meters. The summary shall show the number of meters or overall tests found within each of the following accuracy classifications: (a) No recording. (b) Creeping. (c) Equal to or less than 94.0%. (d) 94.1 to 96.0%. (e) 96.1 to 97.0%. (f) 97.1 to 98.0%. (g) 98.1 to 99.0%. (h) 99.1 to 100.0%. (i) 100.1 to 101.0%. (j) 101.1 to 102.0%. (k) 102.1 to 103.0%. (l) 103.1 to 104.0%. (m) 104.1 to 106.0%. (n) Over 106.0%. When a utility is subject to multiple state jurisdiction, these accuracy classifications may be modified with the approval of the commission. (3) For all meters that are included in the provisions of R 460.3613(2)(b), the utility shall file, with the commission, on or before the first day of April, all of the following information: (a) A summary of all samples of meter lots that pass the acceptability criteria as set forth in ANSI/ASQC Z1.9-1980, including complete data on all of the following: (i) The type of meter. (ii) The number of meters in a lot. (iii) The size of the sample. (iv) The average months in service since the last test. (v) The computed p (total estimated percent defective in lot). (vi) The corresponding M (maximum allowable percent defective) as determined from table B-3 in ANSI/ASQC Z1.9-1980. (b) The necessary calculations made pursuant to Example B-3 of ANSI/ASQC Z1.9-1980 shall be retained for each sample or resample drawn. In addition to the actual computation, the data shall include all of the following: (i) The type of meter. (ii) The number of meters in the lot. (iii)The meter numbers of sample meters. (iv) The actual prior-to-adjustment test data of each meter tested. (v) The number of months since the last test for each meter in the sample. A sample of the calculations and data for a lot that passes the acceptability criteria shall be included in the report to the commission. (c) A copy of the complete data, as outlined in this subrule, shall be included for each meter lot that is not in compliance with the acceptability criteria of the sampling plan employed as set forth in ANSI/ASQC Z1.9-1980. (d) A report summarizing the testing of all meters in rejected lots that are to be returned to service. The heavy load preadjustment tests only shall be recorded, and the accuracy classifications as established in subrule (2) of this rule shall be used. Each rejected lot shall be reported separately and shall be separated into groups by the number of months since the last test as follows: (i) 0 to 48 months. (ii) 49 to 72 months. (iii) 73 to 96 months. (iv) More than 96 months. History: 1983 AACS; 1995 AACS. R 460.3618 Generating and interchange station meter tests; schedule; accuracy limits. Rule 618. (1) Generating and interchange station and watthour meters shall be tested in conjunction with their associated equipment as follows: (a) At least once every 24 months for generating station meters. (b) At least once every 12 months for interchange meters. (2) The accuracy limits for any particular device shall not be greater than the accuracy limits required elsewhere in these rules. History: 1983 AACS. PART 7. STANDARDS OF QUALITY OF SERVICES R 460.3701 Alternating current systems; standard frequency. Rule 701. The standard frequency for alternating current systems shall be 60 hertz. The frequency shall be maintained within limits that will permit the satisfactory operation of customers' clocks which are connected to the system. History: 1983 AACS; 1996 AACS. R 460.3702 Standard nominal service voltage; limits; exceptions. Rule 702. (1) Each utility shall adopt and submit standard nominal service voltages. (2) With respect to secondary voltages, the following provisions shall apply: (a) For all retail service, the variations of voltage shall be not more than 5% above or below the standard nominal voltage as submitted pursuant to subrule (1) of this rule, except as noted in subrule (4) of this rule. (b) Where 3-phase service is provided, the utility shall exercise reasonable care to ensure that the phase voltages are balanced within practical tolerances. (3) With respect to primary voltages, the following provisions shall apply: (a) For service rendered principally for industrial or power purposes, the voltage variation shall not be more than 5% above or below the standard nominal voltages as submitted pursuant to subrule (1) of this rule, except as noted in subrule (4) of this rule. (b) The limitations in subdivision (a) of this subrule do not apply to special contracts in which the customer specifically agrees to accept service with unregulated voltage. (4) Voltages outside the limits specified in this rule shall not be considered a violation if the variations are infrequent fluctuations or occur from adverse weather conditions, service interruptions, causes beyond the control of the utility, or voltage reductions that are required to reduce system load at times of supply deficiency or loss of supply. History: 1983 AACS; 1996 AACS. R 460.3703 Voltage measurements and records. Rule 703. (1) Voltage measurements shall be made at the utility's service terminals. (2) Each utility shall make a sufficient number of voltage measurements, using recording voltmeters, to determine if voltages are in compliance with the requirements stated in R 460.3702. (3) All records obtained under subrule (2) of this rule shall be retained by the utility for not less than 2 years and shall be available for inspection by the commission's representatives. The records shall indicate all of the following information: (a) The location where the voltage was measured. (b) The time and date of the measurement. (c) The results of the comparison with an indicating voltmeter at the time a recording meter is set. History: 1983 AACS; 1996 AACS. R 460.3704 Voltage measurements; required equipment; periodic checks; certificate or calibration card for standards. Rule 704. (1) Each utility shall have access to at least 1 indicating voltmeter that has a stated accuracy within 0.25% of full scale. The instrument shall be maintained within its stated accuracy. (2) Each utility shall have not less than 2 indicating voltmeters that have a stated accuracy within 1.0% of full scale. (3) Each utility shall have not less than 2 portable recording voltmeters, or their electronic equivalent, with a stated accuracy within 1.5% of full scale. (4) Standards shall be checked in accordance with R 460.3612. (5) Working instruments shall be checked in accordance with R 460.3610. (6) Each standard shall be accompanied at all times by a certificate or calibration card, duly signed and dated, on which the corrections required to compensate for errors found at the customary test points at the time of the last test are recorded. History: 1983 AACS; 1996 AACS. R 460.3705 Interruptions of service; records; planned interruption; notice to commission. Rule 705. (1) Each utility shall make a reasonable effort to avoid interruptions of service. When interruptions occur, service shall be restored within the shortest time practical, consistent with safety. (2) Each utility shall keep records of sustained interruptions of service to its customers and shall make an analysis of the records for the purpose of determining steps to be taken to prevent recurrence of the interruptions. The records shall include the following information concerning the interruptions: (a) Cause. (b) Date and time. (c) Duration. (3) Planned interruptions shall be made at a time that will not cause unreasonable inconvenience to customers and shall be preceded, if feasible, by adequate notice to persons who will be affected. (4) Each utility shall promptly notify the commission of any major interruption of service to its customers. History: 1983 AACS; 1996 AACS. PART 8. SAFETY R 460.3801 Protective measures. Rule 801. Each utility shall exercise reasonable care to reduce the hazards to which its employees, its customers, and the general public may be subjected. History: 1983 AACS. R 460.3802 Safety program. Rule 802. Each utility shall comply with the provisions of the occupational safety and health act, 29 U.S.C. S651 et seq., and Act No. 154 of the Public Acts of 1974, as amended, being S408.1001 et seq. of the Michigan Compiled Laws, and known as the Michigan occupational safety and health act, and shall operate under applicable federal and state health and safety laws and regulations. History: 1983 AACS; 1996 AACS. R 460.3803 Energizing services. Rule 803. When energizing services, each utility shall comply with the provisions of all applicable codes and statutory requirements, unless otherwise specified by the commission. The utility may refuse to energize a service if an unsafe condition is observed. History: 1983 AACS; 1996 AAC. R 460.3804 Accidents; notice to commission. Rule 804. Each utility shall promptly notify the commission of fatalities and serious injuries that are substantially related to the facilities or operations of the facilities. History: 1996 AACS. R 460.3901 Rescinded. History: 1983 AACS; 1989 AACS; 1996 AACS. R 460.3902 Rescinded. History: 1983 AACS; 1996 AACS. R 460.3903 Rescinded. History: 1983 AACS; 1996 AACS. R 460.3904 Rescinded. History: 1983 AACS; 1996 AACS. R 460.3905 Rescinded. History: 1983 AACS; 1996 AACS. R 460.3906 Rescinded. History: 1983 AACS; 1996 AACS. R 460.3907 Rescinded. History: 1996 AACS. R 460.3908 Rescinded. History: 1996 AACS.